Better Cumulative Effects Assessment Needed for BC Hydro’s Proposed Site C Peace River Dam
April 4, 2013
AWA comments on the adequacy of BC Hydro’s environmental impact statement for its proposed Site C Dam on the Peace River in northeastern BC. AWA calls for more rigorous cumulative effects assessment of regional habitat for wide-ranging carnivores and caribou, and of aquatic ecosystem effects downstream to the Peace-Athabasca Delta.